DESIGN/BUILD INTERIOR RETROFIT

PRE-CONSTRUCTION

  • Cost Estimates
  • Budget Constraints
  • Pre-construction meetings/conferences
  • Needs of Project
  • Cost Control
  • Design/Feasibility/Constructibility
  • Communication
  • Schedule
  • Site Assessments/Logistics
  • Document Control

POST-CONSTRUCTION

  • Painting
  • Flooring
  • HVAC/Plumbing
  • Electrical
  • General Carpentry
  • Special Construction
  • Manuals/Warranties
  • Closeout Documents
  • Final Project Report and Payment

CONSTRUCTION

  • Permits/Certificates of Insurance/Bonds
  • Submittals/Samples/Data Sheets
  • Updates Schedule/Review
  • Shop Drawings
  • Document Control
  • Recordkeeping
  • Change Orders
  • Progress Meetings/Reports
  • Monitoring/Reporting Progress
  • Punchlists
  • Testing/Inspections
  • Progress Payment Documentation
  • Demo
  • Coordination of Drawings
  • Project Management
  • Supervision
  • Layout
  • Drywall/Framing

Projects

GSA: Converted entire 2nd floor North End at CMS. Changed and reconfigured walls, replaced carpet. Increased and rerouted existing pipe work for HVAC. Replaced and tied into new Fire Alarm system. Removed and re-installed all Cat 6 cable and Fiber-optic cables.
Contact Person: Mark Talarico
Amount: $3,465,764.9

UP